News & Knowledge
Contact Us
Mobile: +86-19279864570
Email: 40045692@qq.com
QQ: 40045692
Address: Building 5, No. 936 Guoshun Road, Nanqiao Town, Fengxian District, Shanghai
investment 220.4 100 million yuan 宁煤70 10,000 tons made 烯烃 project through 生态 ring 境部批复
currently for/regarding ring 境保护 policy requirements is non 常严格, 宁夏回族自治区政府 related 部门克服 ring 评规划, and other amount substitute/replace, ring 境污染 material decrease and other more issues, make can group 宁夏煤业 group has company 70 10,000 tons / year made new material project ring report to ring 境部批复.
3 month 23 day, can 宁煤煤基 new material project 部副主任孙华山 table/sheet 示, “ ring as is project 开展 第一道关口, is most difficult 一道关口, 自2016 year 8 month ring as 以, more 部门 支持 and lower, solution project in environmental protection difficult 题, is rear construction provide has conditions. ”

据 introduction, can group 宁夏煤业 group has company 70 10,000 tons / year made new material project 位于宁东 can chemical industry 基, by 国务院列 is large development “十三五”规划 heavy large project, investment 220.4 100 million yuan, 以当 煤炭资源 is raw materials, production high polyolefin product. 70 10,000 tons / year made new material project is production high polyolefin product innovation type engineering, for 宁夏煤炭就 转化 improves add value, understanding high polyolefin product for outer degree, improvement inner polyolefin product industry structure and good high quality development new and other 方面均 tool has important 意义.
据宁夏回族自治区生态 ring ring effect/influence evaluation and tube/pipe 理处副处 long introduction, is project front as 进程, 自治区生态 ring formed 立专班跟踪服务, 建立 联席会议 made degree, combined 自治区 development 改革委, industrial and 信息化厅协调 solution 煤炭消 consumption and other amount substitute/replace, material emission reduction decrease and other key/critical issues, is project ring 评受理奠定基础. 经 不懈努 force, ring 境部于3 month 19 day 批复 该 project ring report. lower 一步, 宁夏回族自治区生态 ring will according to requirements ring tube/pipe as, project environmental protection and engineering meanwhile design, meanwhile 施工, meanwhile start production use, green construction, environmental protection 运行, 尽早发挥经济社会效益.

国家 can group 宁夏煤业 group has company 70 10,000 tons / year made new material project construction inner 容包括主体 engineering, use engineering, engineering and environmental protection engineering and other. engineering powder add pressure gas 化, 变换, low temperature alcohol 洗, recycling, alcohol combined formed, alcohol made 烯烃, ethylene -醋 acid ethylene ester, low density polyethylene (PE), ultra-high molecular weight polyethylene (PE), polypropylene (PP), separation and other production plant/unit. engineering 包括储罐, 储煤筒仓, polymer formed product 库, formed product and other. engineering main/primary 包括动 force 站(3台380吨/ small powder 炉, 2开1备), active water system, remove salt water and liquid made 站, and other. environmental protection engineering main/primary comprehensive 生化处理 plant/unit, salt waste water plant/unit, 锅炉烟 gas measures, gas recycling, hot oxidation 炉, generally solid waste material 暂存场1 base/seat, waste 暂存库1 base/seat and other. project utilizing 本 煤炭资源426.33 10,000 tons / year, its in raw materials 煤339.4 10,000 tons / year, material 煤86.93 10,000 tons / year. new water consumption amount 1034.97万立方米/ year. project investment 220.4 100 million yuan, its in environmental protection investment 17.6 100 million yuan, investment 8.0%.
EN
