News & Knowledge
Contact Us
Mobile: +86-19279864570
Email: 40045692@qq.com
QQ: 40045692
Address: Building 5, No. 936 Guoshun Road, Nanqiao Town, Fengxian District, Shanghai
Fourth Construction in SINOPEC high density polyethylene (PE) control system formed 功就位
8 month 8 day,由 Fourth Construction electrical company 员工承建 in SINOPEC 一体化 project 35 10,000 tons / year high density polyethylene (PE) plant/unit control system analysis small 屋吊装 one-time formed 功就位, is analysis small rear pressure tube/pipe and cable, light 缆敷设施工创造 has conditions.
8 month 7 day, Fourth Construction electrical in SINOPEC 一体化 project chemical industry separation to procurement notice, 35 10,000 tons / year high density polyethylene (PE) plant/unit 12吨 heavy, 12米 long, 2.5米 wide, 3米 high analysis small to 货, requirements project fast 组织人员 for analysis small 屋进行吊装就位. due to analysis small 屋体积庞 large, heavy, is year Fourth Construction electrical company plant/unit in most large, most heavy analysis small 屋. in to notice rear, Fourth Construction electrical in SINOPEC 一体化 project high degree heavy 视, 立即组织 project safety 部, quality and as 业队伍召开紧急会议, made analysis small 屋 吊装 solution/scheme. 8 month 8 day, project 质检部门工 as 人员首先 to 35 10,000 tons / year high density polyethylene (PE) plant/unit reaction 区, for analysis small 屋 基础进行检查, testing, ensure conditions tool 备. in analysis small to 场, in 检验之 rear 开始进入吊装工序, lower 午15时 50 separation, analysis small 屋按坐标就位 formed 功. analysis small 屋就位 rear, 开始进入 analysis small 屋搭设 hard 维护, ensure analysis small in rear 不发生人 is loss bad, 此举受 to high degree 赞扬, Fourth Construction electrical 仪施工队伍 is 一 事事想 in front, technology hard, has 组织, has 纪律 专业化施工队伍.
EN
